Facts & Figures
- Completion date: May 2018
- Location: Uxbridge
- Area: 100 sq m
- Programme: 2 days
Industrial Flooring Project Scope.
A weak screed in need of localised repairs. The soft surface had been generating dust and damaged patches were inhibiting the movement of cameras and jibs within the Storage area.
Elgood Industrial Flooring installed four studio floors for IMG over 5 years ago. IMG contacted us to see how the shortcomings of the screed could be overcome.
A pragmatic approach was required to minimise disruption. The removal of the screed would have been expensive, invasive and time consuming.
In this instance, overlaying the screed with hard wearing interlocking tiles was the ideal solution.
Preparation for Industrial Flooring
A weak screed in need of localised repairs. The soft surface had been generating dust and damaged patches were inhibiting the movement of cameras and jibs within the Storage area.
Industrial Flooring system.
The Ecotile 500 with a thickness of 7mm. A tack coat was applied to further secure the tiles.
Repairs were made to the screed before the tiles were fitted.